Crosstown Parkway Extension Conceptual Environmental Resource Permit (ERP)

American obtained a conceptual ERP for a new crossing over the North Fork St. Lucie River, involving a state park, an aquatic preserve, and state sovereign submerged lands. In addition, American created two mitigation packages.{…}

Crosstown Parkway Extension, Manth Lane to US 1

This project is the final segment of a new $150 million, 10-mile parkway that was planned, designed, and constructed by the City of Port St Lucie. This final eastern 1.5-mile segment between Manth Lane and{…}

Dalton’s Green Hat

Provided 3D modeling and animation, video production and graphic design services for this contract. This project involved a video fly-through across the City of Dalton describing proposed parks, sidewalks, greenways, and blueways. The City plans{…}

Design-Build for the Installation of Median Cable Barrier Along I-75, I-275, I-95 and I-4

American was responsible for the design of several Median Cable Barrier installation projects. Each project included cable-barrier to prevent vehicles from crossing the median, eliminating median crossover accidents. The barriers consisted of double face steel{…}

Districtwide PD&E Services

American supported the District in the development, evaluation, and/or documentation of planning, engineering, environmental and cultural resource activities as outlined in the PD&E Manual. Tasks included the implementation of community involvement/public information programs, assisting in{…}

Gandy Boulevard

Provided 3D modeling and animation services, video production services, as well as public involvement support services. This project involved preparing a Project Development and Environment (PD&E) Study to consider proposed improvements on Gandy Boulevard in{…}

Gandy Boulevard Survey and Mapping

Responsible for creating right-of-way maps, legal descriptions for right-of-way takes, and right-of-way appraiser maps and coordination with appraisers. The goal of this roadway project included improvement to 2.4 miles of the Gandy Boulevard corridor by{…}

GDOT: Westside Truck Route – Waynesboro

This project includes the design for a new truck bypass route on Waynesboro’s west side that will connect SR 56 with SR 121/US 25 and on to SR 56 North. The proposed roadway will consist{…}

Golden Gate Boulevard Bridge Replacement Design-Build

American was the lead engineer to replace two bridges on Golden Gate Boulevard. One bridge crosses the Golden Gate Main Canal and the other crosses the Miller Canal. The bridges were designed as two lanes{…}

Hart Bridge over St. Johns River Painting and Rehabilitation

Under a District-wide Bridge Repair contract, American was responsible for completing a full finite element analysis, load rating and re-painting and rehabilitation design of the Hart Bridge over the St. Johns River, a three-span continuous{…}