20th Street Extension from Zephyrhills East Bypass (Chancy Road)

American prepared the right-of-way maps and all legal descriptions necessary for the construction. GEOPAK was utilized to aid in the design process. 20th Street was extended approximately one-half mile to complete a new north-south corridor.{…}

CR 41 / Ft. King Highway, Intersection With Daughtery Road

Prepared the right-of-way maps and all legal descriptions necessary for construction and was responsible for answering RFIs from the contractor during construction in regards to any survey layout, right-of-way or survey control questions. The existing{…}

Gandy Boulevard Survey and Mapping

Responsible for creating right-of-way maps, legal descriptions for right-of-way takes, and right-of-way appraiser maps and coordination with appraisers. The goal of this roadway project included improvement to 2.4 miles of the Gandy Boulevard corridor by{…}

Lutz Lake Fern Road from Suncoast Parkway to Dale Mabry Highway

American managed all aspects of the preliminary and final design and analysis for this 3.9-mile widening project, from a two-lane roadway to a four-lane divided urban highway. The project development and environment (PD&E) study included{…}

SR 70 at US 441 Intersection

American is providing right of way mapping for the proposed improvements to the corridor including the widening on all four approaches to provide dual left-turn lanes. Along US 441, existing pavement marking for the parking{…}