Design-Build for the Installation of Median Cable Barrier Along I-75, I-275, I-95 and I-4


Design-Build for the Installation of Median Cable Barrier Along I-75, I-275, I-95 and I-4

Client: FDOT Districts 1, 5, and 7

Location: Manatee and Charlotte Counties

Construction Value: Approximately $5 million

Completion Date: 2008–2011

Description:

American was responsible for the design of several Median Cable Barrier installation projects. Each project included cable-barrier to prevent vehicles from crossing the median, eliminating median crossover accidents. The barriers consisted of double face steel beam guardrail with rub rail.