SR 56 DDI

I-75/SR 56 Interchange from W of CR 54 to W of Cypress Bridge The purpose of this project is to reconstruct the existing I-75 at SR 56 diamond interchange to a diverging diamond interchange (DDI). Specific improvements include modifying lane configurations to improve capacity, geometric refinements along SR 56 and the I-75 ramps to accommodate […]
Read “SR 56 DDI”
Read “SR 56 DDI”

Tom Adams Bridge

Tom Adams Bridge Rehabilitation American provided rehabilitation design of the 19-span 997-foot-long bridge. The bridge included a center bascule span with an opening of 103 feet. A comprehensive water inspection of the entire structure (above and below) was performed, including the mechanical and electrical systems, steel girder bascule spans, pile bents, tender house, and approach […]
Read “Tom Adams Bridge”
Read “Tom Adams ...”