Edgewater Drive Widening

From Midway Boulevard to Harbor Drive This $25 million project consisted of total reconstruction of two miles of Edgewater Drive from Harbor Drive to Midway Boulevard. This two-lane to four-lane widening project also includes the replacement of three multi-span bridges. The project is a residential area and will create a major east-west route of the […]
Read “Edgewater Drive Widening”
Read “Edgewater ...”

Turnpike Mainline Widening

From North of Johnson Street to Griffin Road American was selected to conduct this PD&E study and design to evaluate the alternatives for widening approximately 3.7 miles of the Florida’s Turnpike from six to eight lanes. These improvements provide for the milling, resurfacing, and widening of the Turnpike, geometric revisions to the Griffin Road Interchange, […]
Read “Turnpike Mainline Widenin...”
Read “Turnpike M...”