Capri Isles Bridge Replacement

Sarasota County, Florida
Client City of Venice
Completed 2020

Capri Isles Bridge Replacement CEI

The Capri Isles Bridge Replacement project is located on Capri Isles Boulevard over Curry Creek in Venice, Florida. The existing three-span bridge is being replaced by a two-span, integrated flat slab bridge. The project began with a pre-construction conference on January 3, 2020 and was completed in June 2020, about two months ahead of schedule. This project includes relocating 12-inch water and reclaimed water lines and installing new valves. Our services included quality control of the materials, CEI inspection and management, as well as working closely with the City of Venice Public Information Office to provide information to the local residents on the status of the project and information on the detour of the traffic.

This was an emergency contract and demonstrates how American effectively managed the risk for the city and helped the contractor to complete the project early.

Capri Isles Bridge Replacement CEI

The Capri Isles Bridge Replacement project is located on Capri Isles Boulevard over Curry Creek in Venice, Florida. The existing three-span bridge is being replaced by a two-span, integrated flat slab bridge. The project began with a pre-construction conference on January 3, 2020 and was completed in June 2020, about two months ahead of schedule. This project includes relocating […]