Districtwide Bridge Repair Design Consultant

Districtwide | FDOT District 3
Client FDOT D3
Completed 2021

Emergency Repairs in D3 (2 bridges); Approach Slab prototype project on I-10

This contract involves various tasks including complex expansion joint replacements, pile jacket installation, life cycle studies, LRFR load rating updates, painting projects, approach slab replacements and various other bridge repair tasks. American completed emergency repair plans for SR 8 (I-10) over SR 69 after an over-height vehicle carrying construction equipment severely damaged the exterior beam. American also worked on the design of a precast, prestressed, transversely post-tensioned approach slab along SR 8 (I-10) over Apalachicola Northern Railroad, which was the first of its kind in the state once constructed. With the success of that project, the precast methodology has become the standard for approach slab replacements in the District, and won a 2020 ACEC award in the small projects category.

Emergency Repairs in D3 (2 bridges); Approach Slab prototype project on I-10

This contract involves various tasks including complex expansion joint replacements, pile jacket installation, life cycle studies, LRFR load rating updates, painting projects, approach slab replacements and various other bridge repair tasks […]