Districtwide Bridge Repair Design Consultant

Districtwide | FDOT District 3
Client FDOT D3
Completed 2021

Emergency Repairs in D3 (2 bridges); Approach Slab prototype project on I-10

This contract involves various tasks including complex expansion joint replacements, life cycle studies, LRFR load rating updates, and painting projects. Most recently, American completed emergency repair plans for SR 399 over US 98 after a truck severely damaged the exterior beam. Final plans and specifications for this emergency repair were produced within two weeks. American also worked on the design of a precast, prestressed, transversely post-tensioned approach slab along SR 8 (I-10) over Apalachicola Northern Railroad, which will be the first of its kind in the state once constructed. The new slab replaced the existing east approach slab in the westbound direction that is cracked and settling. The project also involved 100 feet of roadway reconstruction and will be completed with nightly lane closures.

Emergency Repairs in D3 (2 bridges); Approach Slab prototype project on I-10

This contract involves various tasks including complex expansion joint replacements, life cycle studies, LRFR load rating updates, and painting projects. Most recently, American completed emergency repair plans for SR 399 over US 98 after a truck severely damaged the exterior beam. Final plans and specifications for this emergency repair were produced within two weeks […]