SR 123 Reconstruction and Flyover Design

Okaloosa County, Florida
Client FDOT D3
Completed 2013 / 2016 (construction)

From North of Turkey Creek to SR 85 North

This project included 1.7-mile two- to four-lane rural reconstruction design including a flyover design for SR 123. The two-span flyover bridge is over 390 feet long and includes curved steel girders with a cast-in-place concrete deck. The project included MSE walls along the approach roadway and required coordination with Eglin Air Force Base due to aesthetic requirements. American also provided detailed maintenance of traffic plans due to horizontal and vertical alignment changes, and temporary signalization for the SR 123/SR 85 intersection. Additional services included signing and marking plans, utility coordination, permitting, pond designs, landscaping, lighting, and power line design.

This project has been recognized with an Outstanding Roadway Project award by the Florida Institute of Consulting Engineers (FICE).

From North of Turkey Creek to SR 85 North

This project included 1.7-mile two- to four-lane rural reconstruction design including a flyover design for SR 123. The two-span flyover bridge is over 390 feet long and includes curved steel girders with a cast-in-place concrete deck. The project included MSE walls along the approach roadway and required coordination with Eglin Air Force Base due to aesthetic requirements […]