From Kracker Avenue to South of SR 676 (Causeway Boulevard)
This PD&E study evaluated improvements for the four- to six-lane widening of US 41 (SR 45) from Kracker Avenue to South of Causeway Boulevard (SR 676), approximately 7 miles. Bridges over Bullfrog Creek and the Alafia River are recommended to be replaced. The proposed improvements will include construction of stormwater management and floodplain compensation ponds […]US 41 PD&E Study
From Kracker Avenue to South of SR 676 (Causeway Boulevard)
This PD&E study evaluated improvements for the four- to six-lane widening of US 41 (SR 45) from Kracker Avenue to South of Causeway Boulevard (SR 676), approximately 7 miles. Bridges over Bullfrog Creek and the Alafia River are recommended to be replaced. The proposed improvements will include construction of stormwater management and floodplain compensation ponds and intersection improvements, in addition to multimodal facilities (trail, pedestrian, bicycle and transit accommodations).This project was screened through the FDOT’s Efficient Transportation Decision Making (ETDM) process and the study was processed as a State Environmental Impact Report (SEIR). A public hearing was conducted on January 26, 2016 and the SEIR was approved on January 12, 2017.